Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
three-room house, Bungalow in Federal B Area, Karachi

Federal B Area · Karachi

Bungalow for a three-room house in Federal B Area.

A bungalow copied from a coastal villa wastes the side setback you actually have.

What a three-room house means in Federal B Area

A three-room house in Federal B Area needs light, a kitchen that is not a corridor, and a stair that is not a ladder. Name who sleeps in each room before the drawing starts.

What usually goes wrong

Spending the third bedroom on a double-height hall. The brief then becomes two rooms and a foyer.

Labor rate

Labor follows three rooms. We do not price a villa and then delete a wing. On a labor rate we build the bungalow and you arrange the material. The veranda and the stair are still drawn first. A labor gang cannot invent them on site without costing you the room they occupy.

With material

Material follows the same three rooms, including the stair if the house is two floors. With material, we supply what the bungalow scope lists and we build it. Shade, the roof, and the wet areas are in that list. A glass front is not a substitute for a veranda that works in June.

What moves the figure

A bungalow rate in Federal B Area moves with the covered area, whether the car actually fits the lane, and whether the contract is labor only or with material.

Have this ready when you call

  1. 01

    The plot dimensions, measured, including any cut the road has taken.

  2. 02

    Who lives in the house, so the rooms are not a foyer with beds around it.

  3. 03

    Whether the car must enter, and from which side.

  4. 04

    Labor rate or with material.

Labor rate or with material

Call for the Federal B Area rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Federal B Area plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    A tight plot is being asked to hold a villa’s manners.

  2. 02

    Wet areas are scattered, so the plumbing crosses the whole plan.

  3. 03

    Two street fronts were glazed because the plot is a corner, not because you need two shows.

What changes after the visit

  1. 01

    Shade is drawn before glass.

  2. 02

    Wet areas are grouped. The roof stays a roof, not a tour.

  3. 03

    Afternoon rooms are placed by asking who is home at 3 p.m.

After keys

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

The office

Staged payment is the rule. A quiet site is not financed in advance.

Tariq Mansoor Bangash, Owner

three room house in Federal B Area

A three-room house in Federal B Area is a real brief. It needs light, a kitchen that is not a corridor, and a stair that is not a ladder. It is not a villa that lost a wing.

Families ask for three rooms and are shown a foyer. Bungalow here starts by naming who sleeps where, then the covered area. The cost follows that drawing, not the other way around.

Bungalow in Federal B Area follows this ground. A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.

On this ground

Tariq Mansoor Bangash’s company takes Federal B Area work when the supervision is real.

We do not publish which sector of Federal B Area is best. Two plots on one road can differ by a metre of fill.

Federal B Area streets are lived in. Deliveries and working hours are part of the method, not a footnote.

A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.

Can you plan a three-room house in Federal B Area?

Yes. Three rooms stay three rooms. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material.

How long does a Federal B Area bungalow take?

Most take twelve to twenty-four months after the scope is signed, depending on covered area and finish.

Who designs it?

Maymarian Builders And Developers Company, from Gulshan-e-Maymar.

Will the veranda face the street?

Only if that is where the breeze is. Often it should face the side.

Call for the rate

If you need a plot allotted, stop here. If you own it, message us. Labor rate or with material. The figure is on the phone.