Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
600 square yard plot, Bungalow in Scheme 45, Karachi

Scheme 45 · Karachi

Bungalow for a 600 square yard plot in Scheme 45.

You need the house to be usable in June without a generator running the whole plan.

What a 600 square yard plot means in Scheme 45

Six hundred square yards in Scheme 45 can hold the house and a separate outdoor room. The rooms should still be grouped. A plan that wanders across the plot makes a long roof and a tired walk.

What usually goes wrong

Spreading the building to touch more boundary looks generous on a drawing and expensive in concrete.

Labor rate

The labor rate follows the grouped plan. Open ground is not a labor item. On a labor rate we build the bungalow and you arrange the material. The veranda and the stair are still drawn first. A labor gang cannot invent them on site without costing you the room they occupy.

With material

Material follows the slabs and the walls we actually build. Unused yardage should stay out of the bill. With material, we supply what the bungalow scope lists and we build it. Shade, the roof, and the wet areas are in that list. A glass front is not a substitute for a veranda that works in June.

What moves the figure

A bungalow rate in Scheme 45 moves with the covered area, whether the car actually fits the lane, and whether the contract is labor only or with material.

Have this ready when you call

  1. 01

    The plot dimensions, measured, including any cut the road has taken.

  2. 02

    Who lives in the house, so the rooms are not a foyer with beds around it.

  3. 03

    Whether the car must enter, and from which side.

  4. 04

    Labor rate or with material.

Labor rate or with material

Call for the Scheme 45 rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Scheme 45 plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    Five marla manners are being stretched over a speech about villas.

  2. 02

    The bungalow is really a ground floor waiting for a floor the slab cannot take.

  3. 03

    The veranda is a strip of leftover tile, not a room.

What changes after the visit

  1. 01

    The veranda faces the breeze this lane has.

  2. 02

    One court, not two performances.

  3. 03

    The bungalow is a single house with a name on the contract, not a reduced villa.

After keys

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

The office

If the papers and the ground disagree, we stop before excavation. A fast start that has to be undone is not a saving.

Tariq Mansoor Bangash, Owner

600 square yard house in Scheme 45

A 600 square yard plot in Scheme 45 can hold a house and a real outdoor room. It can also hold a plan that wanders. We draw the rooms first, then decide how much of the yard stays open.

Labor rate or with material are both available on a 600 square yard house. Call 0321-2000130 or 0321-2000690 and say which contract you want. Bungalow in Scheme 45 is quoted for the covered area we agree.

Bungalow in Scheme 45 follows this ground. Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.

On this ground

A house in Scheme 45 should still be legible in ten years.

Search interest in Scheme 45 is usually a plot the family already owns. That is the job we take.

Scheme 45 sits on the same side of the city as our office. We still visit before we programme a pour, because the internal road may not match the plan.

Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.

Do you build 600 square yard houses in Scheme 45?

Yes. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. We build this size across Karachi residential plots.

Is a bungalow the same as house construction?

A bungalow is a single-family house. House construction is the wider contract. If you want this shape of house, say so and we scope that.

Do you build bungalows in Scheme 45?

Yes. A single-family house with a veranda, planned for the plot and the lane, not copied from a villa.

Do you take bungalow renovation as well as a new bungalow?

Renovation is its own contract. A new bungalow is this one. We do not mix the prices.

Call for the rate

Ask for the written scope. That page becomes the contract. Labor rate or with material. The figure is on the phone.