What a double storey house means in Scheme 45
A double storey in Scheme 45 is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.
What usually goes wrong
Promising the first floor later, on concrete nobody designed for it.
Labor rate
Labor for two floors includes the stair. A hole with no stair is not a complete structure. On a labor rate we build the bungalow and you arrange the material. The veranda and the stair are still drawn first. A labor gang cannot invent them on site without costing you the room they occupy.
With material
With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material, we supply what the bungalow scope lists and we build it. Shade, the roof, and the wet areas are in that list. A glass front is not a substitute for a veranda that works in June.
What moves the figure
A bungalow rate in Scheme 45 moves with the covered area, whether the car actually fits the lane, and whether the contract is labor only or with material.
Have this ready when you call
- 01
The plot dimensions, measured, including any cut the road has taken.
- 02
Who lives in the house, so the rooms are not a foyer with beds around it.
- 03
Whether the car must enter, and from which side.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Scheme 45 rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Scheme 45 plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
Five marla manners are being stretched over a speech about villas.
- 02
The bungalow is really a ground floor waiting for a floor the slab cannot take.
- 03
The veranda is a strip of leftover tile, not a room.
What changes after the visit
- 01
The veranda faces the breeze this lane has.
- 02
One court, not two performances.
- 03
The bungalow is a single house with a name on the contract, not a reduced villa.
After keys
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
If the papers and the ground disagree, we stop before excavation. A fast start that has to be undone is not a saving.
Tariq Mansoor Bangash, Owner
double storey house in Scheme 45
A double storey house in Scheme 45 is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.
If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. Bungalow either includes the upper floor now or it says the slab cannot take it.
Bungalow in Scheme 45 follows this ground. Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.
On this ground
A house in Scheme 45 should still be legible in ten years.
Search interest in Scheme 45 is usually a plot the family already owns. That is the job we take.
Scheme 45 sits on the same side of the city as our office. We still visit before we programme a pour, because the internal road may not match the plan.
Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.
Do you build a double storey in Scheme 45?
Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.
Is a bungalow the same as house construction?
A bungalow is a single-family house. House construction is the wider contract. If you want this shape of house, say so and we scope that.
Do you build bungalows in Scheme 45?
Yes. A single-family house with a veranda, planned for the plot and the lane, not copied from a villa.
Do you take bungalow renovation as well as a new bungalow?
Renovation is its own contract. A new bungalow is this one. We do not mix the prices.
Call for the rate
Ask for the written scope. That page becomes the contract. Labor rate or with material. The figure is on the phone.