What a 120 square yard plot means in Buffer Zone
A 120 square yard house in Buffer Zone is the family size we see most. One stair, wet areas stacked above each other, and a car only when the turning on this lane is real.
What usually goes wrong
Quotes for 120 yards disagree because they hide different covered areas. Compare the drawing, not the yardage on the letter.
Labor rate
A labor rate on 120 yards still needs you to know the covered area. Two families on the same plot can build very different houses. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.
With material
With material, the cement and steel follow that covered area. A 120 is not half of a 240, so the slab is not half a 240 slab. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Buffer Zone plot do not match. We name them before anyone orders.
What moves the figure
The grey-structure figure in Buffer Zone moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.
Have this ready when you call
- 01
Plot papers and the yardage on the ground, not only in the chat.
- 02
Whether a floor will be added later. That decision is made in this slab.
- 03
Where the bathrooms are. The drops cannot be invented after the concrete.
- 04
Labor rate, or with material.
Labor rate or with material
Call for the Buffer Zone rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Buffer Zone plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The quote ends at ‘slab’ and the baths have nowhere to fall.
- 02
A grey structure cost with no covered area is a number you cannot compare.
- 03
You were told grey structure is simple, then handed a cantilever the plot does not need.
What changes after the visit
- 01
Brickwork stops at a line you can point at. The finish contract starts there.
- 02
Each stage is photographed, including the cover.
- 03
Sleeves are marked for a later bath.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
The office
Handover is a snag list and a named contact. The photograph is not the end of the job.
Tariq Mansoor Bangash, Owner
120 square yard house in Buffer Zone
A 120 square yard house is the size that shows up most often in Buffer Zone searches and in the folder of quotes a family brings to the office. Those quotes rarely share a covered area, which is why they do not agree.
120 square yards is not a smaller 240. The section, the stair, and the wet areas change. Grey structure on this plot starts with measuring the lane, including the cut the road has already taken.
Grey structure in Buffer Zone follows this ground. Plots in Buffer Zone punish a plan copied from a 240 yard Maymar house. The rooms become corridors. We would rather draw fewer rooms that can hold a bed.
On this ground
We do not publish which sector of Buffer Zone is best. Two plots on one road can differ by a metre of fill.
If the Buffer Zone plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.
Buffer Zone lanes are narrow. Shuttering and a mixer have to be sequenced so the neighbour’s gate still opens.
Plots in Buffer Zone punish a plan copied from a 240 yard Maymar house. The rooms become corridors. We would rather draw fewer rooms that can hold a bed.
Do you take a 120 square yard house in Buffer Zone?
Yes. Call 0321-2000130 or 0321-2000690. Say whether you want the labor rate or the contract with material, and we will give the rate for this 120 yard plot.
Will you use a standard footing in Buffer Zone?
Only if the hole agrees. Filled ground gets the footing it needs.
Do you take grey structure in Buffer Zone?
Yes. Foundations, columns, slabs, and brickwork, stopped at a written line. The office is in Gulshan-e-Maymar.
Can grey structure in Buffer Zone be paused?
Yes. The pause is real only if drops, levels, and the stair are already decided.
Call for the rate
A photograph of the lane is enough to know if Saturday is worth it. Labor rate or with material. The figure is on the phone.


