What an 80 square yard plot means in Scheme 45
On 80 square yards in Scheme 45 you can have a real room, a stair if the house is two floors, and a kitchen that is not the corridor. A car fits only if the lane allows the cut. A foyer does not fit.
What usually goes wrong
The usual mistake is pasting a 240 yard plan onto 80 yards until every bedroom is a passage. Renovation here gets its own section.
Labor rate
Labor on 80 yards is a short job, so a wrong stair shows up immediately. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.
With material
The material list is smaller than a 240, and it is still specific: the steel in that stair and the brick in those rooms, not a rate copied from a bigger house. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.
What moves the figure
Renovation in Scheme 45 moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.
Have this ready when you call
- 01
Photographs of the house as it stands, and the year it was built if you know it.
- 02
What must keep working during the job, especially a bathroom.
- 03
Whether you want another floor. That is a look at the existing slab.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Scheme 45 rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Scheme 45 plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The empty-house price arrived for a full house.
- 02
Every coat made the bath harder to understand.
- 03
You cannot tell what is built and what was only hoped for.
What changes after the visit
- 01
We open before we price the finish.
- 02
If the frame deserves to stay, we keep it. If it does not, we say why.
- 03
One bathroom stays usable when the family is in the house.
After keys
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
The office
Maymarian Builders And Developers Company is owned by Tariq Mansoor Bangash. The office is First R1 Lane, A42, Gulshan-e-Maymar, Karachi.
Tariq Mansoor Bangash, Owner
80 square yard house in Scheme 45
An 80 square yard house in Scheme 45 cannot wear a 240 yard plan. The stair, the car, and one real room have to be drawn for this footprint, or the house becomes a corridor with a bed in it.
An 80 square yard house in Scheme 45 can be a labor rate, or a contract with material. Covered area and the lane move the figure. Call 0321-2000130 or 0321-2000690 and we will give you that rate. It is not printed on this page.
Renovation in Scheme 45 follows this ground. Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.
On this ground
From First R1 Lane, a Scheme 45 plot is a visit, not a pin on a brochure.
Search interest in Scheme 45 is usually a plot the family already owns. That is the job we take.
Scheme 45 sits on the same side of the city as our office. We still visit before we programme a pour, because the internal road may not match the plan.
Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.
Can you build on an 80 square yard plot in Scheme 45?
Yes. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. WhatsApp is on 0321-2000130. The plan is drawn for 80 yards, not shrunk from a larger house.
Will you add a floor in Scheme 45?
Only after the slab is seen.
What if the house in Scheme 45 was never finished?
We write a list of what is built and what was only planned, and we price that gap. An incomplete house is not described as a coat of paint.
Can you work while we live in the Scheme 45 house?
Often, yes. The programme leaves one bathroom usable and stages the dust. If the job cannot be lived in, we say so before we start.
Call for the rate
Ask for a written scope after the visit. That page is what the contract is built from. Labor rate or with material. The figure is on the phone.


