What a 10 marla house means in Federal B Area
Ten marla in Federal B Area is large enough to sprawl. The part people cannot see in a finish photograph is the lanter, the concrete roof slab.
What usually goes wrong
Asking for a per-foot lanter rate with no span, no steel, and no answer about the floor above it. Those three are the slab.
Labor rate
Labor for the lanter is the carpenters and the steel fixers on that span. It is not the same job as an 80 yard roof. On a labor rate we build the bungalow and you arrange the material. The veranda and the stair are still drawn first. A labor gang cannot invent them on site without costing you the room they occupy.
With material
With material, the lanter is cement, steel, and thickness. Another floor on top of it changes the steel. We say so before the pour. With material, we supply what the bungalow scope lists and we build it. Shade, the roof, and the wet areas are in that list. A glass front is not a substitute for a veranda that works in June.
What moves the figure
A bungalow rate in Federal B Area moves with the covered area, whether the car actually fits the lane, and whether the contract is labor only or with material.
Have this ready when you call
- 01
The plot dimensions, measured, including any cut the road has taken.
- 02
Who lives in the house, so the rooms are not a foyer with beds around it.
- 03
Whether the car must enter, and from which side.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Federal B Area rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Federal B Area plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
A tight plot is being asked to hold a villa’s manners.
- 02
Wet areas are scattered, so the plumbing crosses the whole plan.
- 03
Two street fronts were glazed because the plot is a corner, not because you need two shows.
What changes after the visit
- 01
Shade is drawn before glass.
- 02
Wet areas are grouped. The roof stays a roof, not a tour.
- 03
Afternoon rooms are placed by asking who is home at 3 p.m.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
The office
Staged payment is the rule. A quiet site is not financed in advance.
Tariq Mansoor Bangash, Owner
10 marla lanter in Federal B Area
A 10 marla house in Federal B Area is large enough to sprawl. The searches that arrive with it are often about the lanter, the concrete roof slab, because that is the part of the cost people cannot see in a finish photograph.
The lanter moves with steel, cover, bay size, and whether a floor above it is real. We do not publish a per-foot lanter rate. Bungalow on a 10 marla plot includes that slab decision in the written scope, after we have walked the ground.
Bungalow in Federal B Area follows this ground. A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
On this ground
Tariq Mansoor Bangash’s company takes Federal B Area work when the supervision is real.
We do not publish which sector of Federal B Area is best. Two plots on one road can differ by a metre of fill.
Federal B Area streets are lived in. Deliveries and working hours are part of the method, not a footnote.
A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
What does a 10 marla lanter cost in Federal B Area?
Call 0321-2000130 or 0321-2000690. The lanter moves with steel, thickness, and whether another floor sits on it. We give the labor rate or the rate with material for this plot. It is not printed here.
How long does a Federal B Area bungalow take?
Most take twelve to twenty-four months after the scope is signed, depending on covered area and finish.
Who designs it?
Maymarian Builders And Developers Company, from Gulshan-e-Maymar.
Will the veranda face the street?
Only if that is where the breeze is. Often it should face the side.
Call for the rate
If you need a plot allotted, stop here. If you own it, message us. Labor rate or with material. The figure is on the phone.