Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
800 square yard plot, Grey structure in Landhi, Karachi

Landhi · Karachi

Grey structure for an 800 square yard plot in Landhi.

Curing was promised in a voice note.

What an 800 square yard plot means in Landhi

Eight hundred square yards in Landhi can be two wings, if the family needs two wings. Otherwise it is one house and open ground. The plot size is not a reason to double the roof.

What usually goes wrong

A foyer wing is the usual waste. It spends a bedroom on a space nobody sits in at 3 p.m.

Labor rate

We price labor for the rooms that are lived in. A ceremonial hall is a choice you can see in the scope. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.

With material

With material, that hall is steel, slab, and brick. If you do not want it, it does not enter the contract. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Landhi plot do not match. We name them before anyone orders.

What moves the figure

The grey-structure figure in Landhi moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.

Have this ready when you call

  1. 01

    Plot papers and the yardage on the ground, not only in the chat.

  2. 02

    Whether a floor will be added later. That decision is made in this slab.

  3. 03

    Where the bathrooms are. The drops cannot be invented after the concrete.

  4. 04

    Labor rate, or with material.

Labor rate or with material

Call for the Landhi rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Landhi plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    A standard footing was copied from a different sector onto filled ground.

  2. 02

    Cover is a number in a book and a guess on site.

  3. 03

    The quote uses a Maymar detail on a different soil.

What changes after the visit

  1. 01

    Each stage is photographed, including the cover.

  2. 02

    Each stage is photographed, because the plaster crew may not be us.

  3. 03

    The stop line between structure and finish is a sentence in the scope.

After keys

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

The office

Staged payment is the rule. A quiet site is not financed in advance.

Tariq Mansoor Bangash, Owner

800 square yard house in Landhi

An 800 square yard house in Landhi is large enough to waste a wing on a foyer. We check who lives there before we spend the yardage. The plot size is not a reason to double the roof.

The labor rate and the with-material rate for 800 yards are different numbers, and both move with the drawing. Call 0321-2000130 or 0321-2000690. Grey structure here is a Karachi residential house, quoted for this plot.

Grey structure in Landhi follows this ground. A Landhi house should be cool at the veranda before it tries to look like a glass box. Shade, the roof, and the wet areas matter more than a street facade copied from the coast.

On this ground

Tariq Mansoor Bangash owns Maymarian. Landhi work is run from First R1 Lane, A42, not from a site hut with no name on the gate.

A house in Landhi should still be legible in ten years.

Landhi is supervised from Maymar on a fixed visit rhythm. The same person who scoped the house comes back for the slab.

A Landhi house should be cool at the veranda before it tries to look like a glass box. Shade, the roof, and the wet areas matter more than a street facade copied from the coast.

Can I get an 800 square yard rate in Landhi?

Yes, by phone. Call 0321-2000130 or 0321-2000690 and say labor rate or with material. We do not print an 800 yard card.

Is brickwork included?

Up to the written line. Finish is another decision.

Are photographs part of grey structure?

Yes. Cover and curing are in the note.

Do you build grey structure on a small plot in Landhi?

Yes. A small plot needs a clearer sequence, because the lane is not yours.

Call for the rate

Name the rooms you need before you name the elevation. Labor rate or with material. The figure is on the phone.