What a 600 square yard plot means in Federal B Area
Six hundred square yards in Federal B Area can hold the house and a separate outdoor room. The rooms should still be grouped. A plan that wanders across the plot makes a long roof and a tired walk.
What usually goes wrong
Spreading the building to touch more boundary looks generous on a drawing and expensive in concrete.
Labor rate
The labor rate follows the grouped plan. Open ground is not a labor item. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
Material follows the slabs and the walls we actually build. Unused yardage should stay out of the bill. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In Federal B Area the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in Federal B Area.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the Federal B Area rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Federal B Area plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
You are being hurried toward a start so the conversation does not have to include the plinth.
- 02
You were told the cost, then told the toilet drops were extra.
- 03
The servant yard disappeared between the first quote and the second.
What changes after the visit
- 01
Drainage, the lane, and the neighbour’s wall are in the first conversation.
- 02
Grey structure and a finished house are two scopes. You choose with the difference written down.
- 03
Yardage, covered area, and finish are three lines in the scope, not one.
After keys
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
We are a construction company. Gulshan-e-Maymar the housing scheme is a different organisation. We do not allot society plots.
Tariq Mansoor Bangash, Owner
600 square yard house in Federal B Area
A 600 square yard plot in Federal B Area can hold a house and a real outdoor room. It can also hold a plan that wanders. We draw the rooms first, then decide how much of the yard stays open.
Labor rate or with material are both available on a 600 square yard house. Call 0321-2000130 or 0321-2000690 and say which contract you want. House construction in Federal B Area is quoted for the covered area we agree.
House construction in Federal B Area follows this ground. A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
On this ground
Tariq Mansoor Bangash’s company takes Federal B Area work when the supervision is real.
If the Federal B Area plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.
Federal B Area streets are lived in. Deliveries and working hours are part of the method, not a footnote.
A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
Do you build 600 square yard houses in Federal B Area?
Yes. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. We build this size across Karachi residential plots.
How do payments work on a Federal B Area house?
Against a completed stage. You are not asked to fund a silent month.
What does house construction in Federal B Area cost?
Covered area, grey structure versus a finished house, fill, and the lane all move the figure. We write it after a visit. We do not give a per-yard rate on the phone.
Do you design and build?
Yes. Architecture and construction sit in one office. The drawing and the wall have the same author.
Call for the rate
If the plot is already yours, message us. If you need a society plot allotted, this is the wrong door. Labor rate or with material. The figure is on the phone.


