What an 800 square yard plot means in Federal B Area
Eight hundred square yards in Federal B Area can be two wings, if the family needs two wings. Otherwise it is one house and open ground. The plot size is not a reason to double the roof.
What usually goes wrong
A foyer wing is the usual waste. It spends a bedroom on a space nobody sits in at 3 p.m.
Labor rate
We price labor for the rooms that are lived in. A ceremonial hall is a choice you can see in the scope. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
With material, that hall is steel, slab, and brick. If you do not want it, it does not enter the contract. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In Federal B Area the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in Federal B Area.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the Federal B Area rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Federal B Area plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
You are being hurried toward a start so the conversation does not have to include the plinth.
- 02
You were told the cost, then told the toilet drops were extra.
- 03
The servant yard disappeared between the first quote and the second.
What changes after the visit
- 01
Drainage, the lane, and the neighbour’s wall are in the first conversation.
- 02
Grey structure and a finished house are two scopes. You choose with the difference written down.
- 03
Yardage, covered area, and finish are three lines in the scope, not one.
After keys
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
We are a construction company. Gulshan-e-Maymar the housing scheme is a different organisation. We do not allot society plots.
Tariq Mansoor Bangash, Owner
800 square yard house in Federal B Area
An 800 square yard house in Federal B Area is large enough to waste a wing on a foyer. We check who lives there before we spend the yardage. The plot size is not a reason to double the roof.
The labor rate and the with-material rate for 800 yards are different numbers, and both move with the drawing. Call 0321-2000130 or 0321-2000690. House construction here is a Karachi residential house, quoted for this plot.
House construction in Federal B Area follows this ground. A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
On this ground
Tariq Mansoor Bangash’s company takes Federal B Area work when the supervision is real.
If the Federal B Area plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.
Federal B Area streets are lived in. Deliveries and working hours are part of the method, not a footnote.
A Federal B Area house sits against neighbours who are already there. Drainage, the party wall, and a bathroom that has to stay usable during renovation decide the first week.
Can I get an 800 square yard rate in Federal B Area?
Yes, by phone. Call 0321-2000130 or 0321-2000690 and say labor rate or with material. We do not print an 800 yard card.
How do payments work on a Federal B Area house?
Against a completed stage. You are not asked to fund a silent month.
What does house construction in Federal B Area cost?
Covered area, grey structure versus a finished house, fill, and the lane all move the figure. We write it after a visit. We do not give a per-yard rate on the phone.
Do you design and build?
Yes. Architecture and construction sit in one office. The drawing and the wall have the same author.
Call for the rate
If the plot is already yours, message us. If you need a society plot allotted, this is the wrong door. Labor rate or with material. The figure is on the phone.


