Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
10 marla house, House construction in Gadap, Karachi

Gadap · Karachi

House construction for a 10 marla house in Gadap.

Neighbours have already built. Your house has to live next to them, not in a brochure.

What a 10 marla house means in Gadap

Ten marla in Gadap is large enough to sprawl. The part people cannot see in a finish photograph is the lanter, the concrete roof slab.

What usually goes wrong

Asking for a per-foot lanter rate with no span, no steel, and no answer about the floor above it. Those three are the slab.

Labor rate

Labor for the lanter is the carpenters and the steel fixers on that span. It is not the same job as an 80 yard roof. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.

With material

With material, the lanter is cement, steel, and thickness. Another floor on top of it changes the steel. We say so before the pour. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.

What moves the figure

In Gadap the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.

Have this ready when you call

  1. 01

    The plot papers, and the yardage written on them.

  2. 02

    The lane, so we know how concrete and steel arrive in Gadap.

  3. 03

    How many people sleep there, and whether the house is one floor or two.

  4. 04

    Whether you want a labor rate or a contract with material.

Labor rate or with material

Call for the Gadap rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Gadap plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    You were told every house of this yardage costs the same.

  2. 02

    A glass front was praised, and nobody asked about June.

  3. 03

    You are being hurried toward a start so the conversation does not have to include the plinth.

What changes after the visit

  1. 01

    The same office draws the set and walks the slab.

  2. 02

    Weekly notes show what changed on site, including the parts that were wrong.

  3. 03

    Steel, slab, and brick are stages you can see before you pay the next one.

After keys

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

The office

Coastal hardware and a Maymar lane are specified differently, by the office that has stood on both.

Tariq Mansoor Bangash, Owner

10 marla lanter in Gadap

A 10 marla house in Gadap is large enough to sprawl. The searches that arrive with it are often about the lanter, the concrete roof slab, because that is the part of the cost people cannot see in a finish photograph.

The lanter moves with steel, cover, bay size, and whether a floor above it is real. We do not publish a per-foot lanter rate. House construction on a 10 marla plot includes that slab decision in the written scope, after we have walked the ground.

House construction in Gadap follows this ground. Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.

On this ground

We read the Gadap papers against the ground and we show you the line where they do not match.

Tariq Mansoor Bangash owns Maymarian. Gadap work is run from First R1 Lane, A42, not from a site hut with no name on the gate.

Gadap is the edge beyond Maymar. Some plots are a short run from the office. Some are not. We say which, after the visit, before we promise a weekly walk.

Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.

What does a 10 marla lanter cost in Gadap?

Call 0321-2000130 or 0321-2000690. The lanter moves with steel, thickness, and whether another floor sits on it. We give the labor rate or the rate with material for this plot. It is not printed here.

Is the society office the same as yours?

No. We build houses. Allotment of scheme plots is a different door, including in Gadap.

How do payments work on a Gadap house?

Against a completed stage. You are not asked to fund a silent month.

How do we start house construction in Gadap?

WhatsApp 0321-2000130 with the plot number and the lane. The first meeting is a visit. The written scope comes after that.

Call for the rate

Ask for the written scope. That page becomes the contract. Labor rate or with material. The figure is on the phone.