What a 5 marla house means in Landhi
Five marla in Landhi is a compact family house. We measure the plot before we accept the word. A marla count in a message is not a dimension.
What usually goes wrong
People expect a villa and then discover the veranda, the car, and the kitchen light cannot all be large. One of them has to be chosen.
Labor rate
The labor rate waits until the plot is measured. We will not build to a marla that was guessed. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
Material is ordered to the measured footprint. A guess here becomes the wrong steel. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In Landhi the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in Landhi.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the Landhi rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Landhi plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The finish level changed and the structure price did not, which means the structure price was never real.
- 02
The front elevation arrived before anyone measured the cut at the lane.
- 03
You are being hurried toward a start so the conversation does not have to include the plinth.
What changes after the visit
- 01
Steel, slab, and brick are stages you can see before you pay the next one.
- 02
Yardage, covered area, and finish are three lines in the scope, not one.
- 03
A three-room brief stays a three-room house.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
The office
Tariq Mansoor Bangash owns the company. The drawing set and the site walk are the same people.
Tariq Mansoor Bangash, Owner
5 marla house in Landhi
A 5 marla house is the family bungalow people describe when they are not thinking in square yards. In Landhi we still measure the plot. A marla count on a message is not a dimension we will build to.
Five marla is tight enough that the veranda, the car, and the kitchen light have to be chosen on purpose. House construction for this house is a modest plan, not a villa with the second floor deleted.
House construction in Landhi follows this ground. A Landhi house should be cool at the veranda before it tries to look like a glass box. Shade, the roof, and the wet areas matter more than a street facade copied from the coast.
On this ground
If the Landhi plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.
We read the Landhi papers against the ground and we show you the line where they do not match.
Landhi is supervised from Maymar on a fixed visit rhythm. The same person who scoped the house comes back for the slab.
A Landhi house should be cool at the veranda before it tries to look like a glass box. Shade, the roof, and the wet areas matter more than a street facade copied from the coast.
Do you build 5 marla houses in Landhi?
Yes. Call 0321-2000130 or 0321-2000690 after the plot is measured. We give the labor rate or the rate with material for that house.
Do you design and build?
Yes. Architecture and construction sit in one office. The drawing and the wall have the same author.
Can you build a 240 square yard house in Landhi?
Yes, when the plot is actually 240 on the ground. We check the papers against the lane before we draw the covered area.
Do you build a three-room house in Landhi?
Yes. Three rooms is a brief, not a smaller version of a villa. The stair, the kitchen, and the afternoon room are drawn on purpose.
Call for the rate
Call 0321-2000130 or 0321-2000690 and ask for a site walk. A rate on the phone is not the conversation. Labor rate or with material. The figure is on the phone.


