Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
120 square yard plot, House construction in Scheme 45, Karachi

Scheme 45 · Karachi

House construction for a 120 square yard plot in Scheme 45.

The drawing you were sent does not know the width of this lane.

What a 120 square yard plot means in Scheme 45

A 120 square yard house in Scheme 45 is the family size we see most. One stair, wet areas stacked above each other, and a car only when the turning on this lane is real.

What usually goes wrong

Quotes for 120 yards disagree because they hide different covered areas. Compare the drawing, not the yardage on the letter.

Labor rate

A labor rate on 120 yards still needs you to know the covered area. Two families on the same plot can build very different houses. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.

With material

With material, the cement and steel follow that covered area. A 120 is not half of a 240, so the slab is not half a 240 slab. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.

What moves the figure

In Scheme 45 the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.

Have this ready when you call

  1. 01

    The plot papers, and the yardage written on them.

  2. 02

    The lane, so we know how concrete and steel arrive in Scheme 45.

  3. 03

    How many people sleep there, and whether the house is one floor or two.

  4. 04

    Whether you want a labor rate or a contract with material.

Labor rate or with material

Call for the Scheme 45 rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Scheme 45 plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    The estimate treats fill as a line item you can delete if you feel brave.

  2. 02

    The mumty is a hope sitting on a roof that was not designed for it.

  3. 03

    The family is ready to move and the papers still do not match the ground.

What changes after the visit

  1. 01

    Drainage, the lane, and the neighbour’s wall are in the first conversation.

  2. 02

    The same names are on the drawing and on the site walk.

  3. 03

    Grey structure and a finished house are two scopes. You choose with the difference written down.

After keys

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

The office

Both numbers reach the office: 0321-2000130 and 0321-2000690. WhatsApp is only on 0321-2000130.

Tariq Mansoor Bangash, Owner

120 square yard house in Scheme 45

A 120 square yard house is the size that shows up most often in Scheme 45 searches and in the folder of quotes a family brings to the office. Those quotes rarely share a covered area, which is why they do not agree.

120 square yards is not a smaller 240. The section, the stair, and the wet areas change. House construction on this plot starts with measuring the lane, including the cut the road has already taken.

House construction in Scheme 45 follows this ground. Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.

On this ground

People asking if Scheme 45 is a good place to live are asking about schools, water, and the drive. We answer the building part, and we do not pretend to be the society.

We read the Scheme 45 papers against the ground and we show you the line where they do not match.

Scheme 45 sits on the same side of the city as our office. We still visit before we programme a pour, because the internal road may not match the plan.

Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.

Do you take a 120 square yard house in Scheme 45?

Yes. Call 0321-2000130 or 0321-2000690. Say whether you want the labor rate or the contract with material, and we will give the rate for this 120 yard plot.

Do you build a three-room house in Scheme 45?

Yes. Three rooms is a brief, not a smaller version of a villa. The stair, the kitchen, and the afternoon room are drawn on purpose.

How long does house construction in Scheme 45 take?

Most houses take twelve to twenty-four months after the scope is signed, depending on covered area, approvals, and how much of the finish is in this contract.

Who owns Maymarian?

Tariq Mansoor Bangash. The company is Maymarian Builders And Developers Company The office is First R1 Lane, A42, Gulshan-e-Maymar.

Call for the rate

Book the walk while the plot is still the way you found it. Fill and neighbours change. Labor rate or with material. The figure is on the phone.