Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
double storey house, House construction in Gadap, Karachi

Gadap · Karachi

House construction for a double storey house in Gadap.

Neighbours have already built. Your house has to live next to them, not in a brochure.

What a double storey house means in Gadap

A double storey in Gadap is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.

What usually goes wrong

Promising the first floor later, on concrete nobody designed for it.

Labor rate

Labor for two floors includes the stair. A hole with no stair is not a complete structure. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.

With material

With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.

What moves the figure

In Gadap the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.

Have this ready when you call

  1. 01

    The plot papers, and the yardage written on them.

  2. 02

    The lane, so we know how concrete and steel arrive in Gadap.

  3. 03

    How many people sleep there, and whether the house is one floor or two.

  4. 04

    Whether you want a labor rate or a contract with material.

Labor rate or with material

Call for the Gadap rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Gadap plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    You were told every house of this yardage costs the same.

  2. 02

    A glass front was praised, and nobody asked about June.

  3. 03

    You are being hurried toward a start so the conversation does not have to include the plinth.

What changes after the visit

  1. 01

    The same office draws the set and walks the slab.

  2. 02

    Weekly notes show what changed on site, including the parts that were wrong.

  3. 03

    Steel, slab, and brick are stages you can see before you pay the next one.

After keys

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

The office

Coastal hardware and a Maymar lane are specified differently, by the office that has stood on both.

Tariq Mansoor Bangash, Owner

double storey house in Gadap

A double storey house in Gadap is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.

If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. House construction either includes the upper floor now or it says the slab cannot take it.

House construction in Gadap follows this ground. Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.

On this ground

We read the Gadap papers against the ground and we show you the line where they do not match.

Tariq Mansoor Bangash owns Maymarian. Gadap work is run from First R1 Lane, A42, not from a site hut with no name on the gate.

Gadap is the edge beyond Maymar. Some plots are a short run from the office. Some are not. We say which, after the visit, before we promise a weekly walk.

Gadap land is not one soil. Fill, water, and whether a road exists in the rain come before any talk of a covered area. A drawing that assumes a finished lane is how the budget breaks.

Do you build a double storey in Gadap?

Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.

Is the society office the same as yours?

No. We build houses. Allotment of scheme plots is a different door, including in Gadap.

How do payments work on a Gadap house?

Against a completed stage. You are not asked to fund a silent month.

How do we start house construction in Gadap?

WhatsApp 0321-2000130 with the plot number and the lane. The first meeting is a visit. The written scope comes after that.

Call for the rate

Ask for the written scope. That page becomes the contract. Labor rate or with material. The figure is on the phone.