Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
200 square yard plot, House construction in Landhi, Karachi

Landhi · Karachi

House construction for a 200 square yard plot in Landhi.

Yardage is not a plan. A 120, a 200, and a 240 do not share a stair or a section.

What a 200 square yard plot means in Landhi

Two hundred yards in Landhi can take the rooms a family names, plus one decision: the extra room, or the light. Both at once is how the plan gets worse.

What usually goes wrong

People invent a fourth room to use the yardage. The house then has no wall that can hold a bed and a window.

Labor rate

Labor follows the rooms you keep, not the rooms a relative added in the margin. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.

With material

Material follows the same rooms. An extra bathroom that was never drawn becomes an extra slab and an extra stack of steel. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.

What moves the figure

In Landhi the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.

Have this ready when you call

  1. 01

    The plot papers, and the yardage written on them.

  2. 02

    The lane, so we know how concrete and steel arrive in Landhi.

  3. 03

    How many people sleep there, and whether the house is one floor or two.

  4. 04

    Whether you want a labor rate or a contract with material.

Labor rate or with material

Call for the Landhi rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Landhi plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    The finish level changed and the structure price did not, which means the structure price was never real.

  2. 02

    The front elevation arrived before anyone measured the cut at the lane.

  3. 03

    You are being hurried toward a start so the conversation does not have to include the plinth.

What changes after the visit

  1. 01

    Steel, slab, and brick are stages you can see before you pay the next one.

  2. 02

    Yardage, covered area, and finish are three lines in the scope, not one.

  3. 03

    A three-room brief stays a three-room house.

After keys

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

The office

Tariq Mansoor Bangash owns the company. The drawing set and the site walk are the same people.

Tariq Mansoor Bangash, Owner

200 square yard house in Landhi

A 200 square yard plot in Landhi is the awkward middle. It invites one extra room that ruins the others. We would rather draw the rooms the family named than invent a fourth to use up the yardage.

A 200 square yard house in Landhi is priced two ways: labor rate, or with material. Fill and covered area move both. Call 0321-2000130 or 0321-2000690 for the rate on this plot.

House construction in Landhi follows this ground. A Landhi house should be cool at the veranda before it tries to look like a glass box. Shade, the roof, and the wet areas matter more than a street facade copied from the coast.

On this ground

If the Landhi plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.

We read the Landhi papers against the ground and we show you the line where they do not match.

Landhi is supervised from Maymar on a fixed visit rhythm. The same person who scoped the house comes back for the slab.

A Landhi house should be cool at the veranda before it tries to look like a glass box. Shade, the roof, and the wet areas matter more than a street facade copied from the coast.

Is a 200 square yard house the same plan as a 240?

No. Two hundred yards in Landhi gets its own section. Scaling a larger plan is how a room becomes a passage.

Do you design and build?

Yes. Architecture and construction sit in one office. The drawing and the wall have the same author.

Can you build a 240 square yard house in Landhi?

Yes, when the plot is actually 240 on the ground. We check the papers against the lane before we draw the covered area.

Do you build a three-room house in Landhi?

Yes. Three rooms is a brief, not a smaller version of a villa. The stair, the kitchen, and the afternoon room are drawn on purpose.

Call for the rate

Call 0321-2000130 or 0321-2000690 and ask for a site walk. A rate on the phone is not the conversation. Labor rate or with material. The figure is on the phone.