What a 400 square yard plot means in Landhi
Four hundred square yards in Landhi is a full residential plot: the house, a court, and a place for the car without deleting a bedroom to get them.
What usually goes wrong
The mistake is roofing the whole yard because the land is there. You then pay to cool rooms you do not sit in.
Labor rate
Labor on 400 yards is priced from the covered area we agree, not from the empty ground around it. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
With material, a longer roof and a second bath are real quantities of steel and cement. They are written down, not assumed from the yardage. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In Landhi the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in Landhi.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the Landhi rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Landhi plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The finish level changed and the structure price did not, which means the structure price was never real.
- 02
The front elevation arrived before anyone measured the cut at the lane.
- 03
You are being hurried toward a start so the conversation does not have to include the plinth.
What changes after the visit
- 01
Steel, slab, and brick are stages you can see before you pay the next one.
- 02
Yardage, covered area, and finish are three lines in the scope, not one.
- 03
A three-room brief stays a three-room house.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
The office
Tariq Mansoor Bangash owns the company. The drawing set and the site walk are the same people.
Tariq Mansoor Bangash, Owner
400 square yard house in Landhi
A 400 square yard house in Landhi is a full residential plot, not a stretched 240. The court, the car turning, and the rooms the family named have to be drawn before anyone talks about filling the yard.
We build 400 square yard houses across Karachi on a labor rate or with material. House construction in Landhi gets its rate when you call 0321-2000130 or 0321-2000690. The number depends on covered area, and it is not on this page.
House construction in Landhi follows this ground. A Landhi house should be cool at the veranda before it tries to look like a glass box. Shade, the roof, and the wet areas matter more than a street facade copied from the coast.
On this ground
If the Landhi plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.
We read the Landhi papers against the ground and we show you the line where they do not match.
Landhi is supervised from Maymar on a fixed visit rhythm. The same person who scoped the house comes back for the slab.
A Landhi house should be cool at the veranda before it tries to look like a glass box. Shade, the roof, and the wet areas matter more than a street facade copied from the coast.
What is the rate for a 400 square yard house in Landhi?
Call 0321-2000130 or 0321-2000690. Ask for the labor rate or the rate with material. WhatsApp is on 0321-2000130. We give the figure for this plot, not a printed card.
Do you design and build?
Yes. Architecture and construction sit in one office. The drawing and the wall have the same author.
Can you build a 240 square yard house in Landhi?
Yes, when the plot is actually 240 on the ground. We check the papers against the lane before we draw the covered area.
Do you build a three-room house in Landhi?
Yes. Three rooms is a brief, not a smaller version of a villa. The stair, the kitchen, and the afternoon room are drawn on purpose.
Call for the rate
Call 0321-2000130 or 0321-2000690 and ask for a site walk. A rate on the phone is not the conversation. Labor rate or with material. The figure is on the phone.


