What a 200 square yard plot means in Scheme 45
Two hundred yards in Scheme 45 can take the rooms a family names, plus one decision: the extra room, or the light. Both at once is how the plan gets worse.
What usually goes wrong
People invent a fourth room to use the yardage. The house then has no wall that can hold a bed and a window.
Labor rate
Labor follows the rooms you keep, not the rooms a relative added in the margin. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
Material follows the same rooms. An extra bathroom that was never drawn becomes an extra slab and an extra stack of steel. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In Scheme 45 the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in Scheme 45.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the Scheme 45 rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Scheme 45 plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The estimate treats fill as a line item you can delete if you feel brave.
- 02
The mumty is a hope sitting on a roof that was not designed for it.
- 03
The family is ready to move and the papers still do not match the ground.
What changes after the visit
- 01
Drainage, the lane, and the neighbour’s wall are in the first conversation.
- 02
The same names are on the drawing and on the site walk.
- 03
Grey structure and a finished house are two scopes. You choose with the difference written down.
After keys
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
Both numbers reach the office: 0321-2000130 and 0321-2000690. WhatsApp is only on 0321-2000130.
Tariq Mansoor Bangash, Owner
200 square yard house in Scheme 45
A 200 square yard plot in Scheme 45 is the awkward middle. It invites one extra room that ruins the others. We would rather draw the rooms the family named than invent a fourth to use up the yardage.
A 200 square yard house in Scheme 45 is priced two ways: labor rate, or with material. Fill and covered area move both. Call 0321-2000130 or 0321-2000690 for the rate on this plot.
House construction in Scheme 45 follows this ground. Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.
On this ground
People asking if Scheme 45 is a good place to live are asking about schools, water, and the drive. We answer the building part, and we do not pretend to be the society.
We read the Scheme 45 papers against the ground and we show you the line where they do not match.
Scheme 45 sits on the same side of the city as our office. We still visit before we programme a pour, because the internal road may not match the plan.
Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.
Is a 200 square yard house the same plan as a 240?
No. Two hundred yards in Scheme 45 gets its own section. Scaling a larger plan is how a room becomes a passage.
Do you build a three-room house in Scheme 45?
Yes. Three rooms is a brief, not a smaller version of a villa. The stair, the kitchen, and the afternoon room are drawn on purpose.
How long does house construction in Scheme 45 take?
Most houses take twelve to twenty-four months after the scope is signed, depending on covered area, approvals, and how much of the finish is in this contract.
Who owns Maymarian?
Tariq Mansoor Bangash. The company is Maymarian Builders And Developers Company The office is First R1 Lane, A42, Gulshan-e-Maymar.
Call for the rate
Book the walk while the plot is still the way you found it. Fill and neighbours change. Labor rate or with material. The figure is on the phone.


