Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
200 square yard plot, Renovation in Scheme 45, Karachi

Scheme 45 · Karachi

Renovation for a 200 square yard plot in Scheme 45.

A floor was promised on a slab nobody has seen.

What a 200 square yard plot means in Scheme 45

Two hundred yards in Scheme 45 can take the rooms a family names, plus one decision: the extra room, or the light. Both at once is how the plan gets worse.

What usually goes wrong

People invent a fourth room to use the yardage. The house then has no wall that can hold a bed and a window.

Labor rate

Labor follows the rooms you keep, not the rooms a relative added in the margin. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.

With material

Material follows the same rooms. An extra bathroom that was never drawn becomes an extra slab and an extra stack of steel. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.

What moves the figure

Renovation in Scheme 45 moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.

Have this ready when you call

  1. 01

    Photographs of the house as it stands, and the year it was built if you know it.

  2. 02

    What must keep working during the job, especially a bathroom.

  3. 03

    Whether you want another floor. That is a look at the existing slab.

  4. 04

    Labor rate or with material.

Labor rate or with material

Call for the Scheme 45 rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Scheme 45 plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    The empty-house price arrived for a full house.

  2. 02

    Every coat made the bath harder to understand.

  3. 03

    You cannot tell what is built and what was only hoped for.

What changes after the visit

  1. 01

    We open before we price the finish.

  2. 02

    If the frame deserves to stay, we keep it. If it does not, we say why.

  3. 03

    One bathroom stays usable when the family is in the house.

After keys

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

The office

Maymarian Builders And Developers Company is owned by Tariq Mansoor Bangash. The office is First R1 Lane, A42, Gulshan-e-Maymar, Karachi.

Tariq Mansoor Bangash, Owner

200 square yard house in Scheme 45

A 200 square yard plot in Scheme 45 is the awkward middle. It invites one extra room that ruins the others. We would rather draw the rooms the family named than invent a fourth to use up the yardage.

A 200 square yard house in Scheme 45 is priced two ways: labor rate, or with material. Fill and covered area move both. Call 0321-2000130 or 0321-2000690 for the rate on this plot.

Renovation in Scheme 45 follows this ground. Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.

On this ground

From First R1 Lane, a Scheme 45 plot is a visit, not a pin on a brochure.

Search interest in Scheme 45 is usually a plot the family already owns. That is the job we take.

Scheme 45 sits on the same side of the city as our office. We still visit before we programme a pour, because the internal road may not match the plan.

Scheme 45 plots are often compared with Scheme 33 and with Maymar. The comparison fails when the fill is different. Footings follow the hole we dig, not the neighbouring scheme’s detail.

Is a 200 square yard house the same plan as a 240?

No. Two hundred yards in Scheme 45 gets its own section. Scaling a larger plan is how a room becomes a passage.

Will you add a floor in Scheme 45?

Only after the slab is seen.

What if the house in Scheme 45 was never finished?

We write a list of what is built and what was only planned, and we price that gap. An incomplete house is not described as a coat of paint.

Can you work while we live in the Scheme 45 house?

Often, yes. The programme leaves one bathroom usable and stages the dust. If the job cannot be lived in, we say so before we start.

Call for the rate

Ask for a written scope after the visit. That page is what the contract is built from. Labor rate or with material. The figure is on the phone.