Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
200 square yard plot, Renovation in Korangi, Karachi

Korangi · Karachi

Renovation for a 200 square yard plot in Korangi.

An incomplete frame is being called a makeover.

What a 200 square yard plot means in Korangi

Two hundred yards in Korangi can take the rooms a family names, plus one decision: the extra room, or the light. Both at once is how the plan gets worse.

What usually goes wrong

People invent a fourth room to use the yardage. The house then has no wall that can hold a bed and a window.

Labor rate

Labor follows the rooms you keep, not the rooms a relative added in the margin. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.

With material

Material follows the same rooms. An extra bathroom that was never drawn becomes an extra slab and an extra stack of steel. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.

What moves the figure

Renovation in Korangi moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.

Have this ready when you call

  1. 01

    Photographs of the house as it stands, and the year it was built if you know it.

  2. 02

    What must keep working during the job, especially a bathroom.

  3. 03

    Whether you want another floor. That is a look at the existing slab.

  4. 04

    Labor rate or with material.

Labor rate or with material

Call for the Korangi rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Korangi plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    The previous mason closed the wall before anyone found the leak.

  2. 02

    The bathroom failed years ago and every later coat made it harder to see.

  3. 03

    Every coat made the bath harder to understand.

What changes after the visit

  1. 01

    The roof is a separate stage.

  2. 02

    A cracked beam is shown to you before it is boxed in.

  3. 03

    An extra floor waits on a look at the original slab. It is a structural question.

After keys

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

The office

A Maymar lane and a coastal house are specified differently. The office writing your set is the one that has stood on both.

Tariq Mansoor Bangash, Owner

200 square yard house in Korangi

A 200 square yard plot in Korangi is the awkward middle. It invites one extra room that ruins the others. We would rather draw the rooms the family named than invent a fourth to use up the yardage.

A 200 square yard house in Korangi is priced two ways: labor rate, or with material. Fill and covered area move both. Call 0321-2000130 or 0321-2000690 for the rate on this plot.

Renovation in Korangi follows this ground. Korangi plots vary from settled lanes to edges that are still finding their levels. We do not reuse a Maymar footing detail until we have stood on the plot.

On this ground

If Korangi is a society, we are still the builder. Allotment is their door.

If the Korangi plot is filled, the footing follows the soil in the hole. A detail borrowed from another block is only a guess.

Korangi is a planned haul from the Gulshan-e-Maymar office. The programme includes that road. It should not appear as a surprise in month four.

Korangi plots vary from settled lanes to edges that are still finding their levels. We do not reuse a Maymar footing detail until we have stood on the plot.

Is a 200 square yard house the same plan as a 240?

No. Two hundred yards in Korangi gets its own section. Scaling a larger plan is how a room becomes a passage.

Do you add a floor in Korangi?

Only after the existing slab has been seen. An extra floor is a structural decision, not a finish.

Do you renovate occupied houses in Korangi?

Often. One bath stays usable. If the job cannot be lived through, we say so first.

What if the house in Korangi was never finished?

We write a list of what is built and what was only planned, and we price that gap. An incomplete house is not described as a coat of paint.

Call for the rate

WhatsApp a photograph of the lane. We will tell you if a Saturday visit is worth it. Labor rate or with material. The figure is on the phone.