Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
200 square yard plot, Renovation in Ahsanabad, Karachi

Ahsanabad · Karachi

Renovation for a 200 square yard plot in Ahsanabad.

The stair was always too narrow.

What a 200 square yard plot means in Ahsanabad

Two hundred yards in Ahsanabad can take the rooms a family names, plus one decision: the extra room, or the light. Both at once is how the plan gets worse.

What usually goes wrong

People invent a fourth room to use the yardage. The house then has no wall that can hold a bed and a window.

Labor rate

Labor follows the rooms you keep, not the rooms a relative added in the margin. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.

With material

Material follows the same rooms. An extra bathroom that was never drawn becomes an extra slab and an extra stack of steel. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.

What moves the figure

Renovation in Ahsanabad moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.

Have this ready when you call

  1. 01

    Photographs of the house as it stands, and the year it was built if you know it.

  2. 02

    What must keep working during the job, especially a bathroom.

  3. 03

    Whether you want another floor. That is a look at the existing slab.

  4. 04

    Labor rate or with material.

Labor rate or with material

Call for the Ahsanabad rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Ahsanabad plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    Adding a floor skipped the slab.

  2. 02

    A wet slab is about to receive a floor finish.

  3. 03

    Dust and a family in the same stair.

What changes after the visit

  1. 01

    The roof is its own stage. It is not hidden inside a tile package.

  2. 02

    The lane is checked when the damp is low on the wall. Tiles are not the first answer.

  3. 03

    Work is staged so you are not funding a full refit to learn where the leak is.

After keys

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

The office

Drawing and site sit in one office. The set you sign is the set we walk, including the week the detail is wrong.

Tariq Mansoor Bangash, Owner

200 square yard house in Ahsanabad

A 200 square yard plot in Ahsanabad is the awkward middle. It invites one extra room that ruins the others. We would rather draw the rooms the family named than invent a fourth to use up the yardage.

A 200 square yard house in Ahsanabad is priced two ways: labor rate, or with material. Fill and covered area move both. Call 0321-2000130 or 0321-2000690 for the rate on this plot.

We are often called after a previous mason has already closed a damp wall. The first week is opening, not finishing. If the damp is from the lane, tiles will not fix it.

On this ground

Ahsanabad is supervised from Gulshan-e-Maymar, not from a site hut with no name.

A house in Ahsanabad already has neighbours and a road level. The monsoon uses that road, whether the drawing mentions it or not.

Near enough to the Maymar office that supervision stays with the same people. Lanes can be narrow. The programme has to respect that, including where a mixer can actually stand.

The constraint is width, not drama. Excavation, shuttering, and curing are sequenced so the next house can still open its gate. That sequence is written down. It is not left to the day.

Is a 200 square yard house the same plan as a 240?

No. Two hundred yards in Ahsanabad gets its own section. Scaling a larger plan is how a room becomes a passage.

Do you add a floor in Ahsanabad?

Only after the existing slab has been seen. An extra floor is a structural decision, not a finish.

Will you keep the old structure?

When it deserves to stay. You see the opened slab and any cracked beam before we cover them again.

Can you keep the old structure?

When it deserves it. You see the opened work before it is covered.

Call for the rate

WhatsApp a photograph of the lane. We will tell you if a Saturday visit is worth it. Labor rate or with material. The figure is on the phone.