How bungalow is scoped in Gulshan-e-Iqbal
Bungalow in Gulshan-e-Iqbal is priced as a labor rate, or as a contract with material. The figure follows this plot. It is given on the phone, not on a printed card.
What this work includes
A bungalow in Gulshan-e-Iqbal is one family house on its own ground. The useful rooms are the veranda, the car turning, and a kitchen that gets light. A plan copied from a larger villa usually fails on this plot.
Labor rate
On a labor rate we build the bungalow and you arrange the material. The veranda and the stair are still drawn first. A labor gang cannot invent them on site without costing you the room they occupy.
With material
With material, we supply what the bungalow scope lists and we build it. Shade, the roof, and the wet areas are in that list. A glass front is not a substitute for a veranda that works in June.
What moves the figure
A bungalow rate in Gulshan-e-Iqbal moves with the covered area, whether the car actually fits the lane, and whether the contract is labor only or with material.
Have this ready when you call
- 01
The plot dimensions, measured, including any cut the road has taken.
- 02
Who lives in the house, so the rooms are not a foyer with beds around it.
- 03
Whether the car must enter, and from which side.
- 04
Labor rate or with material.
Labor rate or with material
Call for the Gulshan-e-Iqbal rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Gulshan-e-Iqbal plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
Cross ventilation was never asked about.
- 02
The bungalow is sealed toward the only breeze the lane gets.
- 03
The bungalow looks impressive from the gate and airless at 3 p.m.
What changes after the visit
- 01
A modest bungalow is allowed to stay modest.
- 02
Wet areas share a wall.
- 03
Shade is drawn before glass.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
The office
A weekly note that hides the problem is not a note we send.
Tariq Mansoor Bangash, Owner
Bungalow in Gulshan-e-Iqbal
Maymarian builds bungalows from the Gulshan-e-Maymar office, owned by Tariq Mansoor Bangash. We build the house. We do not allot the plot.
A bungalow here can be grey structure first and finish later. The veranda is still drawn now.
Bungalow in Gulshan-e-Iqbal follows this ground. Gulshan-e-Iqbal is already built up. A new house is an insertion between neighbours. Working hours, the gate opposite, and an old footing in the ground matter more than a new elevation.
On this ground
Gulshan-e-Iqbal sits in the part of Karachi this office already works. We do not fly a crew in for a single slab.
A house in Gulshan-e-Iqbal should still be legible in ten years.
From Gulshan-e-Maymar the drive is a known one. Inside Gulshan-e-Iqbal the lane, not the block name, decides how concrete arrives.
Gulshan-e-Iqbal is already built up. A new house is an insertion between neighbours. Working hours, the gate opposite, and an old footing in the ground matter more than a new elevation.
Do you give a bungalow rate for Gulshan-e-Iqbal?
After the visit. Not on the phone.
Is a bungalow just a smaller house?
It is a single-family house with its own ground. It is not a villa with rooms deleted to fit the plot.
Can you keep the plan modest?
Yes. A smaller bungalow with usable rooms is a success. A double-height foyer that deletes a bedroom is not.
Call for the rate
Send the plot number. Say the yardage. The visit is next. Labor rate or with material. The figure is on the phone.


