What a 120 square yard plot means in Gulzar-e-Hijri
A 120 square yard house in Gulzar-e-Hijri is the family size we see most. One stair, wet areas stacked above each other, and a car only when the turning on this lane is real.
What usually goes wrong
Quotes for 120 yards disagree because they hide different covered areas. Compare the drawing, not the yardage on the letter.
Labor rate
A labor rate on 120 yards still needs you to know the covered area. Two families on the same plot can build very different houses. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.
With material
With material, the cement and steel follow that covered area. A 120 is not half of a 240, so the slab is not half a 240 slab. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.
What moves the figure
In Gulzar-e-Hijri the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.
Have this ready when you call
- 01
The plot papers, and the yardage written on them.
- 02
The lane, so we know how concrete and steel arrive in Gulzar-e-Hijri.
- 03
How many people sleep there, and whether the house is one floor or two.
- 04
Whether you want a labor rate or a contract with material.
Labor rate or with material
Call for the Gulzar-e-Hijri rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Gulzar-e-Hijri plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
Two contractors have walked past the gate and neither asked where the sewer sits.
- 02
The family is ready to move and the papers still do not match the ground.
- 03
The approval is assumed. The excavation date is already in the message.
What changes after the visit
- 01
Steel, slab, and brick are stages you can see before you pay the next one.
- 02
The covered area is agreed before the elevation, so the house you priced is the house we draw.
- 03
A three-room brief stays a three-room house.
After keys
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
The office
Call 0321-2000130 or 0321-2000690. WhatsApp is on 0321-2000130. Someone at the Gulshan-e-Maymar office answers during working hours.
Tariq Mansoor Bangash, Owner
120 square yard house in Gulzar-e-Hijri
A 120 square yard house is the size that shows up most often in Gulzar-e-Hijri searches and in the folder of quotes a family brings to the office. Those quotes rarely share a covered area, which is why they do not agree.
120 square yards is not a smaller 240. The section, the stair, and the wet areas change. House construction on this plot starts with measuring the lane, including the cut the road has already taken.
Gulzar-e-Hijri mixes plot sizes and house ages on the same street. A new house has to live next to an older one without stealing its light or dumping water into its yard. We draw the drainage before the front wall.
On this ground
A house in Gulzar-e-Hijri should still be legible in ten years.
Gulzar-e-Hijri is a lane, a fill, and a sewer position. Those three matter more than the sector’s reputation.
It is close enough to Gulshan-e-Maymar for weekly site walks without a separate camp. Streets are mixed: some tight, some open. The method follows the street.
Houses of different ages share a block. Groundwater and roof leaks show up more often than exotic soil problems. We look at the neighbour's courtyard before we set our plinth, because water does not respect a boundary wall.
Do you take a 120 square yard house in Gulzar-e-Hijri?
Yes. Call 0321-2000130 or 0321-2000690. Say whether you want the labor rate or the contract with material, and we will give the rate for this 120 yard plot.
Do you take house construction in Gulzar-e-Hijri?
Yes, after we have walked the plot. The office is in Gulshan-e-Maymar. Gulzar-e-Hijri is supervised from there by the same people who wrote the scope.
Do you design and build?
Yes. Architecture and construction sit in one office. The drawing and the wall have the same author.
Who do I call for house construction in Gulzar-e-Hijri?
Maymarian Builders And Developers Company, First R1 Lane, A42, Gulshan-e-Maymar. WhatsApp is on 0321-2000130.
Call for the rate
Talk to the office that will still be there at the slab. Labor rate or with material. The figure is on the phone.


