Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
double storey house, House construction in Gulzar-e-Hijri, Karachi

Gulzar-e-Hijri · Karachi

House construction for a double storey house in Gulzar-e-Hijri.

You are choosing between a finished house and a pause at grey structure, and nobody has asked the covered area.

What a double storey house means in Gulzar-e-Hijri

A double storey in Gulzar-e-Hijri is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.

What usually goes wrong

Promising the first floor later, on concrete nobody designed for it.

Labor rate

Labor for two floors includes the stair. A hole with no stair is not a complete structure. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.

With material

With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.

What moves the figure

In Gulzar-e-Hijri the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.

Have this ready when you call

  1. 01

    The plot papers, and the yardage written on them.

  2. 02

    The lane, so we know how concrete and steel arrive in Gulzar-e-Hijri.

  3. 03

    How many people sleep there, and whether the house is one floor or two.

  4. 04

    Whether you want a labor rate or a contract with material.

Labor rate or with material

Call for the Gulzar-e-Hijri rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Gulzar-e-Hijri plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    Two contractors have walked past the gate and neither asked where the sewer sits.

  2. 02

    The family is ready to move and the papers still do not match the ground.

  3. 03

    The approval is assumed. The excavation date is already in the message.

What changes after the visit

  1. 01

    Steel, slab, and brick are stages you can see before you pay the next one.

  2. 02

    The covered area is agreed before the elevation, so the house you priced is the house we draw.

  3. 03

    A three-room brief stays a three-room house.

After keys

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

The office

Call 0321-2000130 or 0321-2000690. WhatsApp is on 0321-2000130. Someone at the Gulshan-e-Maymar office answers during working hours.

Tariq Mansoor Bangash, Owner

double storey house in Gulzar-e-Hijri

A double storey house in Gulzar-e-Hijri is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.

If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. House construction either includes the upper floor now or it says the slab cannot take it.

Gulzar-e-Hijri mixes plot sizes and house ages on the same street. A new house has to live next to an older one without stealing its light or dumping water into its yard. We draw the drainage before the front wall.

On this ground

A house in Gulzar-e-Hijri should still be legible in ten years.

Gulzar-e-Hijri is a lane, a fill, and a sewer position. Those three matter more than the sector’s reputation.

It is close enough to Gulshan-e-Maymar for weekly site walks without a separate camp. Streets are mixed: some tight, some open. The method follows the street.

Houses of different ages share a block. Groundwater and roof leaks show up more often than exotic soil problems. We look at the neighbour's courtyard before we set our plinth, because water does not respect a boundary wall.

Do you build a double storey in Gulzar-e-Hijri?

Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.

Do you take house construction in Gulzar-e-Hijri?

Yes, after we have walked the plot. The office is in Gulshan-e-Maymar. Gulzar-e-Hijri is supervised from there by the same people who wrote the scope.

Do you design and build?

Yes. Architecture and construction sit in one office. The drawing and the wall have the same author.

Who do I call for house construction in Gulzar-e-Hijri?

Maymarian Builders And Developers Company, First R1 Lane, A42, Gulshan-e-Maymar. WhatsApp is on 0321-2000130.

Call for the rate

Talk to the office that will still be there at the slab. Labor rate or with material. The figure is on the phone.