Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
double storey house, Renovation in Ahsanabad, Karachi

Ahsanabad · Karachi

Renovation for a double storey house in Ahsanabad.

The stair was always too narrow.

What a double storey house means in Ahsanabad

A double storey in Ahsanabad is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.

What usually goes wrong

Promising the first floor later, on concrete nobody designed for it.

Labor rate

Labor for two floors includes the stair. A hole with no stair is not a complete structure. A labor rate covers the people who open, rebuild, and plaster. You arrange cement, steel, and brick if the structure needs them. We do not price a paint job as a new house, and we do not price a new slab as paint.

With material

With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material, replacement of a bath, a lintel, or a slab is in one scope. You can see which lines are labor and which lines are material before work starts.

What moves the figure

Renovation in Ahsanabad moves with what we find in the wall, whether an extra floor is even possible, and whether you are asking for labor only or material with it.

Have this ready when you call

  1. 01

    Photographs of the house as it stands, and the year it was built if you know it.

  2. 02

    What must keep working during the job, especially a bathroom.

  3. 03

    Whether you want another floor. That is a look at the existing slab.

  4. 04

    Labor rate or with material.

Labor rate or with material

Call for the Ahsanabad rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Ahsanabad plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    Adding a floor skipped the slab.

  2. 02

    A wet slab is about to receive a floor finish.

  3. 03

    Dust and a family in the same stair.

What changes after the visit

  1. 01

    The roof is its own stage. It is not hidden inside a tile package.

  2. 02

    The lane is checked when the damp is low on the wall. Tiles are not the first answer.

  3. 03

    Work is staged so you are not funding a full refit to learn where the leak is.

After keys

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

The office

Drawing and site sit in one office. The set you sign is the set we walk, including the week the detail is wrong.

Tariq Mansoor Bangash, Owner

double storey house in Ahsanabad

A double storey house in Ahsanabad is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.

If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. Renovation either includes the upper floor now or it says the slab cannot take it.

We are often called after a previous mason has already closed a damp wall. The first week is opening, not finishing. If the damp is from the lane, tiles will not fix it.

On this ground

Ahsanabad is supervised from Gulshan-e-Maymar, not from a site hut with no name.

A house in Ahsanabad already has neighbours and a road level. The monsoon uses that road, whether the drawing mentions it or not.

Near enough to the Maymar office that supervision stays with the same people. Lanes can be narrow. The programme has to respect that, including where a mixer can actually stand.

The constraint is width, not drama. Excavation, shuttering, and curing are sequenced so the next house can still open its gate. That sequence is written down. It is not left to the day.

Do you build a double storey in Ahsanabad?

Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.

Do you add a floor in Ahsanabad?

Only after the existing slab has been seen. An extra floor is a structural decision, not a finish.

Will you keep the old structure?

When it deserves to stay. You see the opened slab and any cracked beam before we cover them again.

Can you keep the old structure?

When it deserves it. You see the opened work before it is covered.

Call for the rate

WhatsApp a photograph of the lane. We will tell you if a Saturday visit is worth it. Labor rate or with material. The figure is on the phone.