What a double storey house means in Surjani Town
A double storey in Surjani Town is decided in the first slab: the stair, the toilet drops, and the weight of the upper floor. If the house is already standing, the first job is to look at that slab.
What usually goes wrong
Promising the first floor later, on concrete nobody designed for it.
Labor rate
Labor for two floors includes the stair. A hole with no stair is not a complete structure. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.
With material
With material, the upper floor is in the steel of the first slab, or it is refused. It is not implied. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Surjani Town plot do not match. We name them before anyone orders.
What moves the figure
The grey-structure figure in Surjani Town moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.
Have this ready when you call
- 01
Plot papers and the yardage on the ground, not only in the chat.
- 02
Whether a floor will be added later. That decision is made in this slab.
- 03
Where the bathrooms are. The drops cannot be invented after the concrete.
- 04
Labor rate, or with material.
Labor rate or with material
Call for the Surjani Town rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Surjani Town plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
Grey structure was sold as a simple cube.
- 02
The stair opening moved after the steel was cut.
- 03
You want to stop and finish next year, and nothing is marked for that year.
What changes after the visit
- 01
Each stage is photographed, including the cover.
- 02
We refuse a cantilever the plot does not need.
- 03
Excavation is sequenced so the lane is not occupied for a month.
After keys
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
The office
The company has been in operation since 2014. We take fewer houses so a slab still has a name attached to it.
Tariq Mansoor Bangash, Owner
double storey house in Surjani Town
A double storey house in Surjani Town is decided in the first slab. The stair, the toilet drops, and the weight of the upper floor have to be in the concrete. Promising the first floor later, on a slab nobody designed for it, is how the argument starts.
If the house is already standing and you want a floor added, that is a look at the existing structure, not a paint job. Grey structure either includes the upper floor now or it says the slab cannot take it.
Grey structure in Surjani rewards a simple frame. Complex cantilevers on a plot that is still finding its neighbours are a way to spend money you will not see. We keep the structure legible.
On this ground
People asking if Surjani Town is a good place to live are asking about schools, water, and the drive. We answer the building part, and we do not pretend to be the society.
The Surjani Town house should still be legible in ten years: regular bays, a stair that was drawn, a roof someone can walk.
The road into a given sector matters as much as the map. If the lane is dug up, concrete day moves. We would rather write that into the programme than explain it later.
Plots can be more open than an old Karachi lane. Open is not a reason to stretch the roof across the whole land. A simple frame and a grouped set of wet rooms keep the house buildable.
Do you build a double storey in Surjani Town?
Yes, when the structure is drawn for two floors. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material. An extra floor on an old slab waits until we have seen that slab.
Do you build grey structure on a small plot in Surjani Town?
Yes. A small plot needs a clearer sequence, because the lane is not yours.
What does grey structure in Surjani Town cost?
Covered area, soil, and whether the roof must take a later room all change the figure. We price it after a visit. There is no per-yard card.
Are photographs part of grey structure?
Yes. Cover and curing are in the note.
Call for the rate
Call 0321-2000130 or 0321-2000690 and ask for a site walk. A rate on the phone is not the conversation. Labor rate or with material. The figure is on the phone.