Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
240 square yard plot, House construction in Scheme 33, Karachi

Scheme 33 · Karachi

House construction for a 240 square yard plot in Scheme 33.

The family listed three rooms. The drawing shows a hall.

What a 240 square yard plot means in Scheme 33

A 240 square yard plot in Scheme 33 can hold a family house, a car, and some open ground. It cannot hold all three if a double-height foyer is allowed to eat a bedroom.

What usually goes wrong

Treating 240 as a double of 120 produces the wrong stair and the wrong car turning. We measure the plot before we draw either.

Labor rate

The labor rate is for this footprint. It is not a 120 yard rate multiplied. A labor rate means Maymarian builds and you arrange the material: cement, steel, brick, sand, and crush. You still need a drawing, because labor on the wrong plan is wasted money.

With material

With material, the roof and the stair are the lines that move. They are different problems from a 120. With material means labor and material are one contract. We buy what the scope names, and you are not running to the market between the footing and the slab.

What moves the figure

In Scheme 33 the figure moves with covered area, one floor or two, whether the contract stops at grey structure, how much fill is in the hole, and whether you chose labor only or material with it.

Have this ready when you call

  1. 01

    The plot papers, and the yardage written on them.

  2. 02

    The lane, so we know how concrete and steel arrive in Scheme 33.

  3. 03

    How many people sleep there, and whether the house is one floor or two.

  4. 04

    Whether you want a labor rate or a contract with material.

Labor rate or with material

Call for the Scheme 33 rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Scheme 33 plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    Neighbours have built to the line, and the plan ignores them.

  2. 02

    The estimate treats fill as a line item you can delete if you feel brave.

  3. 03

    Someone priced a 240 yard house as if it were a larger 120, with the same stair and the same roof.

What changes after the visit

  1. 01

    Drainage, the lane, and the neighbour’s wall are in the first conversation.

  2. 02

    Yardage, covered area, and finish are three lines in the scope, not one.

  3. 03

    We say if the fill is a problem while it is still a hole.

After keys

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

The office

The weekly note shows the problem before it shows the progress. That is the practice, not a slogan under the logo.

Tariq Mansoor Bangash, Owner

240 square yard house in Scheme 33

A 240 square yard house in Scheme 33 has room to make a mistake look generous. A double-height foyer can eat a bedroom and still leave yardage on the drawing. We check the plot is actually 240 on the ground before we draw that covered area.

People compare a 240 yard house with a 120 as if one were a double of the other. The roof, the stair, and the car turning are different, and so is the rate. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material in Scheme 33.

Scheme 33 plots are not one condition. Some blocks have settled roads and a clear building line. Others are still negotiating levels with the lane. The estimate starts with a level survey, because a house priced on a flat drawing and built on a filled plot is how arguments start.

On this ground

People asking if Scheme 33 is a good place to live are asking about schools, water, and the drive. We answer the building part, and we do not pretend to be the society.

A Scheme 33 price asked for on the phone is a guess. The visit is what turns it into a scope.

Travel from our Gulshan-e-Maymar office is short enough that the same site engineer can hold the job. Access inside Scheme 33 depends on the block. We visit before we programme concrete.

Some Scheme 33 land is filled. Footings follow that fact. We do not reuse a Maymar footing detail on a plot that sponges underfoot. The plinth is set to the road you have, including the monsoon level of that road.

Can you build a 240 square yard house in Scheme 33?

Yes, when the papers and the lane agree that the plot is 240. Call 0321-2000130 or 0321-2000690. We price it as 240, labor rate or with material, not as a larger 120.

Can I send the plot papers before the visit?

Yes, on WhatsApp 0321-2000130. We still walk the ground before a figure.

Who do I call for house construction in Scheme 33?

Maymarian Builders And Developers Company, First R1 Lane, A42, Gulshan-e-Maymar. WhatsApp is on 0321-2000130.

Are you one of the builders people search for in Scheme 33?

We are a construction company in Gulshan-e-Maymar. If your plot is in Scheme 33 and you want it built, call 0321-2000130 or 0321-2000690. We do not sell society plots.

Call for the rate

Book the walk while the plot is still the way you found it. Fill and neighbours change. Labor rate or with material. The figure is on the phone.