Stone cladding and vertical fins going onto the November 2017 house

Residence · 2017 · Karachi

Corner house with stone cladding

Status
Completed
Measure
Two storeys
Place
Karachi

Block work in early November 2017, stone cladding and fins by the end of the month, painted by mid December.

A two-storey house we photographed through November 2017. Block walls and the first slab were up on 8 November, the top floor was in shuttering by the 22nd, and stone cladding with vertical fins went onto the front in the last week of the month. The rooftop railing was being fixed on 30 November.

Photographed
2017, by our site team
Photos on this page
9, unretouched apart from resizing

Photos from site