Skip to content
Maymarian Builders & Developers Co. (Private) Limited
The same house three months later, elevation finished, March 2019

Residence · 2018–2019 · Karachi

Two-storey house, plot to finish

Status
Completed
Measure
Two storeys
Place
Karachi

Grey structure in December 2018, finished elevation by March 2019. The same house, photographed from the same spot.

This is the house we use for the construction journey. In late December 2018 the upper slab was still in shuttering, with the mixer and timber props on the lane. By the end of March 2019 the elevation was finished: vertical fins, brick-tile bands, steel railings and red gates. The neighbours on both sides and the young tree on the pavement are the same in the December and March frames. Earlier photos from October 2018 show a plot being dug and footings cast in the same weeks.

Photographed
2018–2019, by our site team
Photos on this page
9, unretouched apart from resizing
Stage by stage
See this house in the construction journey

Photos from site