What a 10 marla house means in Malir
Ten marla in Malir is large enough to sprawl. The part people cannot see in a finish photograph is the lanter, the concrete roof slab.
What usually goes wrong
Asking for a per-foot lanter rate with no span, no steel, and no answer about the floor above it. Those three are the slab.
Labor rate
Labor for the lanter is the carpenters and the steel fixers on that span. It is not the same job as an 80 yard roof. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.
With material
With material, the lanter is cement, steel, and thickness. Another floor on top of it changes the steel. We say so before the pour. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Malir plot do not match. We name them before anyone orders.
What moves the figure
The grey-structure figure in Malir moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.
Have this ready when you call
- 01
Plot papers and the yardage on the ground, not only in the chat.
- 02
Whether a floor will be added later. That decision is made in this slab.
- 03
Where the bathrooms are. The drops cannot be invented after the concrete.
- 04
Labor rate, or with material.
Labor rate or with material
Call for the Malir rate.
Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.
Labor rate
We build. You arrange the material. The labor rate follows the covered area on the Malir plot.
With material
Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.
What you are walking into
- 01
The quote ends at ‘slab’ and the baths have nowhere to fall.
- 02
Grey structure was sold as a simple cube.
- 03
Brickwork has no stop line, so the finish argument starts inside the structure bill.
What changes after the visit
- 01
You pay the stage you can see: hole, steel, slab, brick.
- 02
Curing is a stage, not a slogan.
- 03
Footings follow the soil in this hole, not a detail from another block.
After keys
Weekly reports, staged payments, no disappearing act. That is why we used them again.
Tariq Farhan, Palm Court, Seaview
A small office, but the same people who sat in the first meeting walked the slab with us.
Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar
They stayed on site until the snag list was closed. Handover matched the drawings we signed.
Imran Habib, Azure House, Clifton
The office
The weekly note shows the problem before it shows the progress. That is the practice, not a slogan under the logo.
Tariq Mansoor Bangash, Owner
10 marla lanter in Malir
A 10 marla house in Malir is large enough to sprawl. The searches that arrive with it are often about the lanter, the concrete roof slab, because that is the part of the cost people cannot see in a finish photograph.
The lanter moves with steel, cover, bay size, and whether a floor above it is real. We do not publish a per-foot lanter rate. Grey structure on a 10 marla plot includes that slab decision in the written scope, after we have walked the ground.
Soil in parts of Malir holds water differently from a Maymar lane. The footing detail is confirmed on site. A standard Maymar section is a starting guess, not a specification.
On this ground
Deliveries for a Malir house follow the road you have, including the weeks it is dug up for someone else’s connection.
People asking if Malir is a good place to live are asking about schools, water, and the drive. We answer the building part, and we do not pretend to be the society.
Malir is a longer drive from Gulshan-e-Maymar than Scheme 33. We take the work when the job is large enough to justify the regular site presence.
Soil and standing water are not the same as a Maymar lane. Footings are confirmed on the plot. Trees that are already doing the cooling are kept if the plan can hold them.
What does a 10 marla lanter cost in Malir?
Call 0321-2000130 or 0321-2000690. The lanter moves with steel, thickness, and whether another floor sits on it. We give the labor rate or the rate with material for this plot. It is not printed here.
Do you take grey structure in Malir?
Yes. Foundations, columns, slabs, and brickwork, stopped at a written line. The office is in Gulshan-e-Maymar.
Do you include the stair in grey structure?
The stair is drawn and the opening is built. A hole with no stair is not a complete structure.
How do we start grey structure in Malir?
WhatsApp 0321-2000130 with the plot and a photograph of the lane. We visit before we order steel.
Call for the rate
Talk to the office that will still answer when the slab is poured. Labor rate or with material. The figure is on the phone.