Maymarian Builders And Developers Company
Skip to content
Maymarian Builders And Developers Company
240 square yard plot, Grey structure in Malir, Karachi

Malir · Karachi

Grey structure for a 240 square yard plot in Malir.

The upper floor is a sentence. It is not yet a load.

What a 240 square yard plot means in Malir

A 240 square yard plot in Malir can hold a family house, a car, and some open ground. It cannot hold all three if a double-height foyer is allowed to eat a bedroom.

What usually goes wrong

Treating 240 as a double of 120 produces the wrong stair and the wrong car turning. We measure the plot before we draw either.

Labor rate

The labor rate is for this footprint. It is not a 120 yard rate multiplied. A labor rate on grey structure is the mason, the carpenter, the steel fixer, and the helpers. You supply cement, steel, brick, sand, and crush. The stair opening and the toilet drops still have to be in the drawing, or the labor builds a frame the finish cannot use.

With material

With material, the roof and the stair are the lines that move. They are different problems from a 120. With material, those same items are in our contract. Steel weight and slab thickness are why two grey-structure quotes on the same Malir plot do not match. We name them before anyone orders.

What moves the figure

The grey-structure figure in Malir moves with the hole we dig, the span of the lanter, whether another floor sits on it, and how much brickwork is inside the stop line.

Have this ready when you call

  1. 01

    Plot papers and the yardage on the ground, not only in the chat.

  2. 02

    Whether a floor will be added later. That decision is made in this slab.

  3. 03

    Where the bathrooms are. The drops cannot be invented after the concrete.

  4. 04

    Labor rate, or with material.

Labor rate or with material

Call for the Malir rate.

Maymarian builds Karachi residential houses on 80, 120, 240, 400, 600, 800, and 1,000 square yard plots. You can take a labor rate, or a contract with material. The figure is given on the phone, for this plot.

Labor rate

We build. You arrange the material. The labor rate follows the covered area on the Malir plot.

With material

Labor and material in one contract. Cement, steel, and the rest sit in the scope we read with you.

What you are walking into

  1. 01

    The quote ends at ‘slab’ and the baths have nowhere to fall.

  2. 02

    Grey structure was sold as a simple cube.

  3. 03

    Brickwork has no stop line, so the finish argument starts inside the structure bill.

What changes after the visit

  1. 01

    You pay the stage you can see: hole, steel, slab, brick.

  2. 02

    Curing is a stage, not a slogan.

  3. 03

    Footings follow the soil in this hole, not a detail from another block.

After keys

  • Weekly reports, staged payments, no disappearing act. That is why we used them again.

    Tariq Farhan, Palm Court, Seaview

  • A small office, but the same people who sat in the first meeting walked the slab with us.

    Ahmed Raza, Bungalow Eleven, Gulshan-e-Maymar

  • They stayed on site until the snag list was closed. Handover matched the drawings we signed.

    Imran Habib, Azure House, Clifton

The office

The weekly note shows the problem before it shows the progress. That is the practice, not a slogan under the logo.

Tariq Mansoor Bangash, Owner

240 square yard house in Malir

A 240 square yard house in Malir has room to make a mistake look generous. A double-height foyer can eat a bedroom and still leave yardage on the drawing. We check the plot is actually 240 on the ground before we draw that covered area.

People compare a 240 yard house with a 120 as if one were a double of the other. The roof, the stair, and the car turning are different, and so is the rate. Call 0321-2000130 or 0321-2000690 for the labor rate or the rate with material in Malir.

Soil in parts of Malir holds water differently from a Maymar lane. The footing detail is confirmed on site. A standard Maymar section is a starting guess, not a specification.

On this ground

Deliveries for a Malir house follow the road you have, including the weeks it is dug up for someone else’s connection.

People asking if Malir is a good place to live are asking about schools, water, and the drive. We answer the building part, and we do not pretend to be the society.

Malir is a longer drive from Gulshan-e-Maymar than Scheme 33. We take the work when the job is large enough to justify the regular site presence.

Soil and standing water are not the same as a Maymar lane. Footings are confirmed on the plot. Trees that are already doing the cooling are kept if the plan can hold them.

Can you build a 240 square yard house in Malir?

Yes, when the papers and the lane agree that the plot is 240. Call 0321-2000130 or 0321-2000690. We price it as 240, labor rate or with material, not as a larger 120.

Do you take grey structure in Malir?

Yes. Foundations, columns, slabs, and brickwork, stopped at a written line. The office is in Gulshan-e-Maymar.

Do you include the stair in grey structure?

The stair is drawn and the opening is built. A hole with no stair is not a complete structure.

How do we start grey structure in Malir?

WhatsApp 0321-2000130 with the plot and a photograph of the lane. We visit before we order steel.

Call for the rate

Talk to the office that will still answer when the slab is poured. Labor rate or with material. The figure is on the phone.